Record the screen, drain, bond point and insulation at each end so the supplier can build and inspect the grounding arrangement you approve.

Specify the shield and drain at both ends

A cable shield can be foil, braid or a combination. A drain wire, when present, contacts a specified conductive shield layer and gives the assembly a separate termination lead. Confirm the exact construction with the cable drawing and mark what happens to each shield layer and the drain wire at End A and End B.

Zeakka drawing 03 lists Al-mylar and a copper braid. For a build that needs a drain wire, obtain a cable specification that explicitly shows the wire and which shield layer it contacts. Open Zeakka UL20267 drawing 03.

Record the connection point and insulation

This example assumes a foil shield with an integral drain wire. The customer’s drawing calls for a bond at End A and local isolation at End B.

End A · Bond via drain lead

Boot covers the foil cut edge. The insulated drain lead ends in a ring terminal at chassis stud CH1.

End B · Isolate shield and drain

Boot covers the foil cut edge. Cap the trimmed drain tip and secure it away from conductive parts. Record no local bond at End B.

Schematic of two ends of one hypothetical assembly. The filled dot shows where the drain wire contacts the foil. The dashed outline shows the insulating boot. The ribbon conductors continue to their signal connector.
Drawing fieldEnd A exampleEnd B example
ShieldDimension the foil cutback from the jacket edge.Dimension the foil cutback from the jacket edge.
Drain wire and contactSpecify the insulated lead length, ring terminal part number and chassis stud CH1.Specify the trimmed length and where to secure the insulated end. No local connection.
InsulationDefine boot coverage at the foil edge and sleeve coverage along the lead to the terminal.Define boot coverage at the foil edge and cap coverage at the drain tip.
VerificationSpecify continuity between the ring terminal and shield at an accessible verification point.Specify isolation between the shield and local connector shell if present. Specify which signal contacts must remain isolated.

Have the equipment designer approve the bonding scheme

The equipment designer decides whether the shield bonds at one end, both ends or another designated point. Give the supplier the exact node for each bond, such as the chassis stud, connector shell or assigned pin on the schematic. A circumferential shield bond to a compatible backshell and a drain pigtail have different impedance at higher frequencies. Confirm the approved scheme in the intended equipment routing and enclosure. See Phoenix Contact’s notes on shield connection impedance.

For first-article approval, agree on the continuity and isolation test points, limits and setup, including whether any check is done before fitting the insulation. Check the cutback, insulation coverage and clearance from nearby conductors. Use the customer’s equipment test plan to verify electromagnetic compatibility (EMC).

Send a marked view of each end with the RFQ

Include the cable and connector references, jacket and shield cutbacks, treatment of any drain wire, the electrical node for each bond, insulation details and the required test record. Add the finished length, drawing revision and quantity. Dimension the jacket break-out and opened ribbon.

Review your ribbon cable assembly