Zeakka Electronics
Bulk ribbon cable buyer guides

What 7/0.127 Means on a Ribbon Cable Drawing

Read the strand count and individual strand diameter alongside AWG before approving a cable for your existing termination.

Read the construction for one conductor

7/0.127 means seven strands, each 0.127 mm in diameter, in one conductor. The drawing's conductor count tells you how many of those conductors run side by side. A 20-conductor ribbon with this construction has 20 separate bundles of seven strands.

The 28 AWG, 20-conductor entry on the 1.0 mm UL2651 specification shows 7/0.127 for construction, 0.39 mm for the bundled conductor diameter and 0.90 ±0.05 mm for the insulated conductor outer diameter. Use the insulated diameter to check the fit called for by a contact specification and the strand dimensions to verify the ordered conductor. See drawing 28.

One conductor, seven strands. The line across the top strand indicates where the 0.127 mm dimension applies. The outer ring represents insulation. Schematic, not to scale.

Resolve conflicting strand values before ordering

Two 2.0 mm grey UL2651 sheets list a 26 AWG, 10-conductor entry with the same 20.0 ±0.3 mm overall width. One gives 7/0.127 with a 0.39 mm bundled conductor diameter. The other gives 7/0.16 with a 0.48 mm bundled diameter. Ask the supplier which drawing and revision apply to the quotation and have them reconcile the AWG, strand construction and conductor resistance on the specification they will supply against. See drawing 31 and drawing 26.

Put the conductor requirement on the RFQ

  1. Identify the drawing and revision, cable pitch and conductor count. Specify AWG, solid or stranded construction, strand count and diameter where applicable, and whether you require bare or tinned copper.
  2. Confirm the maximum conductor resistance and the test conditions used to report it if resistance is an acceptance requirement. Ask for a clarified construction wherever the drawings disagree or list alternatives.
  3. For an existing termination, attach the connector part number and its cable requirements. Check the accepted strand construction and insulation diameter before releasing a substitute. See the IDC cable fit guide.

Request a bulk ribbon cable quotation