Your engineering or purchasing team
Approves the final drawing, BOM, pinout, candidate substitutions, validation plan, and equipment-level suitability.
PURCHASING CHECKLIST
Use this checklist to reduce clarification rounds and compare quotations on the same scope. Send what you already know; Zeakka can identify the remaining questions before coordinating suitable factory options.
A quotation is easier to evaluate when every supplier is working from the same revision, configuration, quantity, and validation scope.
If available, send a drawing, sketch, photo, or short description; a complete drawing or BOM is not required for the first contact.
Share connector or mating-part references if known, including any preference for original or unbranded compatible candidates.
Add any known pinout, wire or cable type, gauge, finished length, and tolerance details.
Give an estimated sample or production quantity if known, and briefly describe the equipment, application, or operating environment.
Flag any known critical application, test, validation, or document requirements early so they can be considered in the scope.
Provide the delivery destination and target timing if known. Missing details can be clarified later, with the necessary scope confirmed before samples or production.
PDF, DWG, STEP, Excel, JPG, or PNG; 3 MB total, up to 5 files
Start with whatever is available; a complete drawing or BOM is not required for the first contact. Zeakka can help clarify missing details, and the necessary scope will be confirmed before a sample or production.
Before selecting a quotation, check that these items are treated consistently.
After you receive offers, use this optional worksheet to compare only the items relevant to your cable assembly, such as configuration, testing, one-off charges, and delivery assumptions.
Download worksheet — Excel, EnglishEditable blank template with no prefilled quotations or prices. You do not need to complete or send this worksheet to contact Zeakka; if you use it, keep or share your copy as you choose.
Set the same drawing revision, configuration and quantities for both quotes.
Record each response and its exclusions. Mark unknown or missing information as ‘To confirm’, not zero or included.
Resolve differences with the suppliers before comparing prices. Record the agreed scope and follow-up owner.
Approves the final drawing, BOM, pinout, candidate substitutions, validation plan, and equipment-level suitability.
Reviews inputs, flags missing or conflicting details, clarifies quotation scope, and coordinates factory options, samples, and revisions.
Manufactures and tests the confirmed configuration to the agreed project scope and provides the documents agreed for that order.
Yes. Send whatever you have, such as a drawing, photo, connector reference, or short description, plus an estimated quantity if known. A complete drawing or BOM is not required initially. Zeakka can help clarify missing details; share known critical application, test, or document needs early, and confirm the necessary scope before samples or production.
Yes. Original connectors can be sourced as part of a complete cable assembly, or you can ask us to review an unbranded compatible candidate. Original connectors are not sold separately.
It typically takes 1–5 business days after the requirements are clear. Complex materials, tooling, or incomplete specifications can require more clarification.
Every cable assembly is checked for continuity and short circuits, while pull testing is sampled. State any additional electrical, mechanical, environmental, or documentation requirement so it can be confirmed for the project.
Send the information available today. Zeakka can help clarify missing details and confirm the necessary scope before a sample or production.