What can a supplier quote from two PCB drawings?
Two board drawings can identify the cable interfaces. They rarely show where the boards sit in the product, which contacts must connect across the cable, or how the cable gets past the enclosure. Send the drawings you have with a short list of open decisions. This lets a supplier price a stated assumption for budgeting and identify what still needs approval before a sample is built.
Make one interface record for each board
Send the assembly drawing or BOM excerpt for the fitted header, including its part number, orientation option and revision. Add a connector detail with pin 1 marked and the viewing side named. A copper-pad drawing can establish a footprint, but several fitted headers may share it. If an approved alternative is permitted, identify who will review its mating pair.
| Record | Evidence supplied | Open item |
|---|---|---|
| Board A · J4 | Rev C assembly drawing and BOM identify a shrouded 2 × 5 header. Pin 1 is marked on the board top view. | Attach the mating connector drawing and identify pin 1 on its cable-side mating face. |
| Board B · J1 | Rev A drawing shows a 2 × 5 footprint. Two different header orientations appear in the BOM. | Equipment owner to confirm which variant is fitted to this machine. |
| Wire list | A separate approved system wiring list confirms J4.1 → J1.3 and J4.2 → J1.4. | The other eight J4 positions are unresolved. Record each as connected, intentionally unused or pending after electrical review. |
The references above are fictional. In this example, the two confirmed rows come from the system wiring list. A pad number, matching signal name or photograph alone would not establish either cross-board connection. Include the relevant schematic extract if power, returns or shared nets need explanation.
Add the one view neither board drawing supplies
Sketch both boards in their installed positions on the same sheet. Mark the connector exits, board spacing, retention clips and any obstruction. In the example, the enclosure drawing puts the two header centres 95 mm apart, but the cable has to run around a bracket. A 95 mm finished length would leave the route and its measurement datums undefined. Show the path with a sketch, CAD section or a measured mock-up and indicate whether length is measured flat or installed.
If the housing is unfinished, ask for a budget quote on a named provisional length and flag who will release the final dimension. Where access is tight, describe which board or cover is installed first and how the technician will grip the socket.
Separate budget assumptions from sample release
- For a budget price, send the two board revisions, likely connector pair, provisional length, sample quantity and expected order quantity. Ask the supplier to list the part and length assumptions beside the quotation.
- For a sample, have the equipment owner approve both fitted headers, mating ends, complete connection table and length datums. Specify which open items block manufacture. Keep the approval with the cable drawing revision.
- For a repeat order, record which board variants the sample fitted, how the net list was verified and which cable revision is released. Recheck the affected interface when a board revision changes.
Use the ribbon cable specification worksheet to capture both interfaces. If the route includes folds, the folded cable drawing example shows how to dimension the installed and flat views.
