Quality Connectors from China. Fast. Reliable. Affordable.
Source wire-to-board, wire-to-wire, pin-header, female-header, and unbranded JST- or Molex-compatible alternatives. We compare suitable factories and coordinate samples for validation.
Our Connector Portfolio
Comprehensive connector solutions covering all major connector types

Wire to Board Connectors
Single and multi-row connectors for PCB mounting with various pitch options.

Wire to Wire Connectors
Mated connector pairs for cable-to-cable connections with locking options.

JST Connector Alternatives
Unbranded JST-compatible alternatives, identified by series reference and validated by drawing and sample.

Molex Connector Alternatives
Unbranded Molex-compatible alternatives, identified by series reference and validated by drawing and sample.

Custom Pin Headers
Single and double row pin headers with custom pitch and length options.

Female Headers
Precision female headers with various pitch and row configurations.
Why Choose Zeakka for Connectors?
Fast sampling, flexible quantities, and competitive pricing—without the complexity.
Fast Sampling
Connector samples are typically prepared in 3–7 days after the selected series, specifications, materials, and quantity are confirmed.
Quality Assurance
We confirm the supplier, quoted material, dimensions, applicable certification requirements, inspection scope, and sample-validation steps for each project.
Flexible MOQ
Connector MOQs are commonly 3,000–5,000 pieces. The exact quantity depends on the series, terminals, plating, color, packaging, and selected factory.
Competitive Pricing
We compare quotations from suitable factories and explain differences in material, MOQ, tooling, testing, lead time, and packing.
Industries We Serve
Common applications include automation equipment, lighting, commercial electronics, test equipment, and other device interconnections.
Industrial Automation
Consumer Electronics
Medical Devices
Automotive Electronics
E-Bikes & Light EVs
Professional AV
Commercial Equipment
Renewable Energy
Ready to Get Started?
Send the series or part reference, quantity, application, and required certifications. Detailed quotations typically take 1–5 business days after the requirements are clear.
