Zeakka Electronics

TRADING & SOURCING PARTNER — NOT A FACTORY

Discrete-wire harnesses coordinated around your requirement

Zeakka reviews your drawing, BOM, pinout or written brief, matches suitable factories and coordinates quotations, samples, production, inspection, packing and delivery.

See assembly options
Discrete-wire harnesses coordinated around your requirement

RFQ

Start with the build information you have

A complete drawing helps, but a useful review can also begin with a BOM, pinout, sample or clear written description.

01

Drawing, BOM, pinout, sample, photos or written build description

02

Specified connector reference, mating interface and circuit count

03

Wire gauge, colours, lengths, branches and termination details

04

Quantity, application and delivery destination

How the project is coordinated

Zeakka is the commercial and sourcing partner between your requirement and suitable factories.

  1. Review the drawing, BOM, pinout or written requirement

  2. Clarify open build, connector and material details

  3. Match suitable factories and compare quotation scope

  4. Coordinate samples and agreed revisions

  5. Coordinate production, inspection, packing and delivery

Connector and harness details to confirm

A named connector is treated as a specified reference. Where an alternative is considered, it is an unbranded compatible candidate subject to drawing or sample validation.

  • Connector reference, pitch, circuits, keying and mating interface
  • Pinout, wire gauge, colour, length and branch routing
  • Terminal, seal, sleeve, label and packaging requirements
  • Material, document or compliance requirements to confirm for the project

For defined point-to-point harness requirements

Use this page when connectors, pinout, wire, branches and finished lengths are part of the assembly requirement. MOQ and lead time are project-specific and confirmed in the quotation.

Inspection coordinated for the agreed scope

Every harness receives continuity and short-circuit testing. Pull-force testing is sampled and defined for the project; other checks are confirmed with the project scope.

  • Continuity and short-circuit test for every harness
  • Project-defined sampled pull-force testing
  • Visual, dimensional, packing or document checks when agreed
  • Inspection points and acceptance details confirmed before production

Discrete-wire harness FAQ

Are you the factory?

No. Zeakka is a trading and sourcing partner. We coordinate requirement review, factory matching, quote comparison, samples and production follow-up.

Can you review a request without a drawing?

Yes. Send a BOM, pinout, connector reference, sample, photos or a written description. We will identify the details still needed for a quote.

Do you supply original or authorized connector brands?

A named connector is used as a specified reference. Any alternative is an unbranded compatible candidate and requires drawing or sample validation; no original or authorization claim is made.

What testing is included?

Every harness receives continuity and short-circuit testing. Pull-force testing is sampled and defined for the project; other checks are agreed for the project.

What are the MOQ and lead time?

Both depend on the parts, process and confirmed scope. They are provided for the individual project, rather than as public fixed numbers.

Send the harness requirement you have

We will review the available information, clarify the scope and coordinate the next project step.