PROJECT RFQ

Submit Your Project Requirements

Send the information available for your cable assembly or connector sourcing project. Zeakka reviews the requirement, clarifies quotation scope, and coordinates suitable factory options as a trading and sourcing partner—not a factory.

Detailed quotations typically take 1–5 business days after the requirements are clear.

Samples are typically prepared in 3–7 days after specifications and materials are confirmed; tooling or special materials may require longer.

Helpful information, if available

You do not need all six items before contacting us. Share any known special constraints early.

  • Drawing, photo, or description
  • Part and mating references
  • Pinout, wire specification, and length
  • Quantity and application
  • Required tests and documents
  • Delivery destination
View the Checklist

How the inquiry is coordinated

Submission starts a commercial requirements review; it does not create an order or guarantee a sample.

  1. 1

    Requirement review

    We check the submitted drawing, BOM, references, quantities, application, and missing inputs.

  2. 2

    Quotation clarification and comparison

    We clarify the quoted configuration and compare suitable factory quotations when the requirement supports it.

  3. 3

    Sample coordination

    After specifications and materials are confirmed, we coordinate sample timing, cost, and the agreed validation scope.

Contact channels

Use the form for the clearest project record, or contact the sourcing team directly.

Project requirement form

Send a drawing, photo, connector reference, or short description. Add estimated quantity if available; we'll help clarify anything missing.

Drag and drop files here, or browse

PDF, DWG, STEP, Excel, JPG, or PNG; 3 MB total, up to 5 files

A detailed quotation typically takes 1–5 business days after the requirements are clear.