PROJECT RFQ
Submit Your Project Requirements
Send the information available for your cable assembly or connector sourcing project. Zeakka reviews the requirement, clarifies quotation scope, and coordinates suitable factory options as a trading and sourcing partner—not a factory.
Detailed quotations typically take 1–5 business days after the requirements are clear.
Samples are typically prepared in 3–7 days after specifications and materials are confirmed; tooling or special materials may require longer.
Helpful information, if available
You do not need all six items before contacting us. Share any known special constraints early.
- Drawing, photo, or description
- Part and mating references
- Pinout, wire specification, and length
- Quantity and application
- Required tests and documents
- Delivery destination
How the inquiry is coordinated
Submission starts a commercial requirements review; it does not create an order or guarantee a sample.
- 1
Requirement review
We check the submitted drawing, BOM, references, quantities, application, and missing inputs.
- 2
Quotation clarification and comparison
We clarify the quoted configuration and compare suitable factory quotations when the requirement supports it.
- 3
Sample coordination
After specifications and materials are confirmed, we coordinate sample timing, cost, and the agreed validation scope.
Contact channels
Use the form for the clearest project record, or contact the sourcing team directly.
Project requirement form
Send a drawing, photo, connector reference, or short description. Add estimated quantity if available; we'll help clarify anything missing.
A detailed quotation typically takes 1–5 business days after the requirements are clear.
